Houses:
The dimension of each house is 6x9 inches. They were constructed in two parts, the rectangular base and the roof. Each base had two holes drilled in for bolts.
We drilled 1.5 inches into the concrete basin floor. Anchors were dropped into the holes and secured. The houses were placed carefully over the holes and bolted down.


After all the houses were securely bolted to the floor, we put the roofs on. The roof was placed on the base and screwed in.
Pavers:
Next, all 75 pavers were placed in the model to be bolted down later.
Hotels:
The hotels were all placed according to the model. Holes were drilled through the support beams within the hotel structure. From here, the hotels were mounted in the same way as the houses. Once the hotels were bolted down, the roofs were screwed into place.
Putting in each structure was a team effort requiring a lot of communication and cooperation.
The last part of construction was touching up the houses with paint to cover any nail holes or scratches the buildings encountered during installation.
Special thanks to Jason Killian, AJ, Alan, Barb, Jason Miles, and Trevor.